XTERRA-ONE CALCULATOR

Plan your energy independence.

Two paths, one goal: turn your energy use and constraints into a clear first estimate of generation, storage and solar capacity.

Technical reference points: Sizing
i
PV array Module selection is not based on wattage alone. Compatibility requires checking string architecture, cold-corrected open-circuit voltage, MPPT window, allowable current, shading, orientation and manufacturer limits. Professional good practice NABCEP — PV Design Specialist — JTA ↗
Net metering
i
Net metering and energy sizing Sizing should start from actual consumption and project goals. Option I records surplus from eligible renewable generation in a kWh bank; the bank is reset according to the current official cycle, presently every 24 months. For Xterra Quebec, battery or vehicle storage is treated as local storage/backup and is not counted as an exportable self-generation source; V2H/V2X is recommended only for backup or off-grid use. Quebec — applicable requirement Hydro-Québec — Net metering Option I ↗
Commissioning
i
Commissioning and verification A completed installation must be inspected, tested and documented. For self-generation connected to Hydro-Québec, compliance testing and the verification report are part of the process before final authorization. Quebec — applicable requirement Hydro-Québec — Self-generation — interconnection process ↗
7 compliance steps
i
7 steps before a Hydro-Québec-compliant installation Xterra separates component compatibility from project compliance. For grid-connected self-generation, the exact bill of materials, diagram, installed equipment, tests and the master electrician's report must remain consistent through final authorization.
  1. Size the project and lock the architecture: consumption, PV capacity, grid, storage and backup.
  2. Identify the exact bill of materials: manufacturers, models, ratings, certifications and equipment characteristics to be submitted.
  3. Prepare the Hydro-Québec application and single-line diagram; an Xterra recommendation is not an interconnection approval.
  4. Wait for conditional acceptance and install according to the accepted file with the qualified electrical contractor.
  5. Verify on site the disconnecting means, labeling, neutral, grounding and consistency between the installation, diagram and bill of materials.
  6. Perform the applicable E.12-07 tests and have the master electrician complete/sign the verification report with the required supporting material.
  7. Submit the report and wait for Hydro-Québec final authorization before grid connection and commissioning.
Quebec — applicable requirement Hydro-Québec — Self-generation — interconnection process ↗
Full reference →

Preliminary estimate. Results are intended for scenario comparison. Actual production, costs, rates and interconnection requirements must be validated before purchase or installation.